]> git.ipfire.org Git - thirdparty/git.git/commitdiff
ci: do not cancel all jobs of a matrix if one fails
authorPhilippe Blain <levraiphilippeblain@gmail.com>
Thu, 28 Jan 2021 04:06:08 +0000 (04:06 +0000)
committerJunio C Hamano <gitster@pobox.com>
Thu, 28 Jan 2021 06:09:42 +0000 (22:09 -0800)
The CI/PR GitHub Actions workflow uses the 'matrix' strategy for the
"windows-test", "vs-test", "regular" and "dockerized" jobs. The default
behaviour of GitHub Actions is to cancel all in-progress jobs in a
matrix if one of the job of the matrix fails [1].

This is not ideal as a failure early in a job, like during installation of
the build/test dependencies on a specific platform, leads to the
cancellation of all other jobs in the matrix.

Set the 'fail-fast' variable to 'false' for all four matrix jobs in the
workflow.

[1] https://docs.github.com/en/actions/reference/workflow-syntax-for-github-actions#jobsjob_idstrategyfail-fast

Signed-off-by: Philippe Blain <levraiphilippeblain@gmail.com>
Signed-off-by: Junio C Hamano <gitster@pobox.com>
.github/workflows/main.yml

index aef66436484af18fb91504f8c9701de7b25e7059..f6885e88ee6b969177cb130d1e18449d35c201e3 100644 (file)
@@ -123,6 +123,7 @@ jobs:
     runs-on: windows-latest
     needs: [windows-build]
     strategy:
+      fail-fast: false
       matrix:
         nr: [0, 1, 2, 3, 4, 5, 6, 7, 8, 9]
     steps:
@@ -227,6 +228,7 @@ jobs:
     runs-on: windows-latest
     needs: [vs-build, windows-build]
     strategy:
+      fail-fast: false
       matrix:
         nr: [0, 1, 2, 3, 4, 5, 6, 7, 8, 9]
     steps:
@@ -272,6 +274,7 @@ jobs:
     needs: ci-config
     if: needs.ci-config.outputs.enabled == 'yes'
     strategy:
+      fail-fast: false
       matrix:
         vector:
           - jobname: linux-clang
@@ -309,6 +312,7 @@ jobs:
     needs: ci-config
     if: needs.ci-config.outputs.enabled == 'yes'
     strategy:
+      fail-fast: false
       matrix:
         vector:
         - jobname: linux-musl