From: eric fang Date: Mon, 20 Apr 2020 07:35:43 +0000 (+0000) Subject: gotest: increase the test timeout X-Git-Tag: basepoints/gcc-11~139 X-Git-Url: http://git.ipfire.org/cgi-bin/gitweb.cgi?a=commitdiff_plain;h=ef8dc9d24055ddeef2fe9cb300b1051d7a440438;p=thirdparty%2Fgcc.git gotest: increase the test timeout The default test timeout duration of the gc compiler is 10 minutes, and the current default timeout duration of gofrontend is 240 seconds, which is not long enough for some big tests. This CL changes it to 600s, so that all tests have enough time to complete. Reviewed-on: https://go-review.googlesource.com/c/gofrontend/+/229657 --- diff --git a/gcc/go/gofrontend/MERGE b/gcc/go/gofrontend/MERGE index e48abcf71d61..5aecee18dd6a 100644 --- a/gcc/go/gofrontend/MERGE +++ b/gcc/go/gofrontend/MERGE @@ -1,4 +1,4 @@ -b76c83f34c006938fe6c3311d949496990bc5db9 +761d68dacefc578e45ff299761f20989aef67823 The first line of this file holds the git revision number of the last merge done from the gofrontend repository. diff --git a/libgo/testsuite/gotest b/libgo/testsuite/gotest index 33f99d77a31f..2bd6b5e2b2a4 100755 --- a/libgo/testsuite/gotest +++ b/libgo/testsuite/gotest @@ -36,7 +36,7 @@ keep=false pkgpath= prefix= dejagnu=no -timeout=240 +timeout=600 testname="" bench="" trace=false