Check and run all enabled scheduled workflows.
Scheduled triggers are evaluated based on a target date field (e.g. added, created, modified, or a custom date field),
- combined with a day offset.
-
- The offset is mathematically negated resulting in the following behavior:
- - Positive offsets mean the workflow should trigger BEFORE the specified date (e.g., offset = +7 → trigger 7 days before)
- - Negative offsets mean the workflow should trigger AFTER the specified date (e.g., offset = -7 → trigger 7 days after)
+ combined with a day offset:
+ - Positive offsets mean the workflow should trigger AFTER the specified date (e.g., offset = +7 → trigger 7 days after)
+ - Negative offsets mean the workflow should trigger BEFORE the specified date (e.g., offset = -7 → trigger 7 days before)
Once a document satisfies this condition, and recurring/non-recurring constraints are met, the workflow is run.
"""